eTAB Works-Estimator-web™
Help › SoR Analysis
SoR Analysis of Rates
Open with
(Ctrl+F). This computes each item’s rate from the
scheduled basic rates of material, labour and machinery, plus loadings.
Using the form
- Pick an item code from the list on the left. Its analysis rows (base items,
sub-items and loadings) appear, with the analysed rate.
- Edit basic rates, loadings or quantities as needed.
- Click Run Analysis to recompute every item. The work runs in the background,
so the form stays responsive.
- Click Save & Close to commit the analysis and close the form.
Run Analysis recalculates composite (sub-) item rates bottom-up, so a
complex item that references a mortar or concrete sub-item always reflects the latest
base rates.
Round-off
The Round-off setting controls the final rounding of each analysed rate
(1, 0.5, 0.25, 0.05 or 0.01). It is saved with the project.
SoR Analysis reads the
scheduled rate tables. Market-rate
justification is done separately in
MR Justification.